AWT system extension
AFT provides the mechanical components for the AWT system extension at the New Surgery of the University Hospital Heidelberg.
With Siemens as general contractor, AFT Schopfheim is responsible for delivering and installing the AWT system extension (approx. 800 m rails). The delivery scope comprises various single and double (rail) switches, an empty vehicle storage area, a container storage area (12 places) directly preceded by a transversal shuttle, plus a large number of floor conveyors. This expansion completes the so called “Ring Closure”, creating a shortcut between the Women’s Clinic and the Medical Clinic.