General Motors subsidiary Shanghai (SGM) places two orders for Wuhan and Jinqiao plant

AFT scored orders from SGM Wuhan and SGM Jinqiao and is now in charge of delivering and installing a heavy duty EMS (electric monorail system), featuring height adjustable hoisting hangers for the Wuhan 2 car plant.

That is a complete system, for an entirely new final assembly line and includes the process of the so-called “marriage”. “Marriage”, in car manufacturer terms, designates the process of joining the engine (or a complete power train) and the chassis. Furthermore, for the Jinqiao plant step 2, AFT is going to deliver an entire set of new height adjustable hangers for an existing heavy duty EMS.